Home Public Works Projects and Programs Downtown Walkable Corners Project

Downtown Walkable Corners Project

Aerial view of draft concept with call-outs showing directional curb ramps, cycle track pedestrian refuge, and bulbout

Additional project updates and information will be published on an on-going basis.

Background

The Downtown Walkable Corners Project will make streets in Downtown Long Beach safer, more inviting, and easier to navigate for people walking, biking, and using mobility devices, while also supporting local businesses and connecting key destinations. 

The project will redesign intersections and corners with bulb-outs and refuge islands to enhance visibility for pedestrians and cyclists, shorten crossing distances, and reduce vehicle turning speeds, creating a more comfortable experience for everyone. It will also introduce green infrastructure through landscaped areas, or bioswales, that help naturally capture and filter stormwater.Bike lanes will also be upgraded with protective barriers.  

These improvements will strengthen Downtown connections to major community destinations, including the Civic Center, Metro A Line stations, the Billie Jean King Main Library, and nearby schools. 

To learn more about the benefits of these infrastructure improvements, watch a short video created by the City’s Walk & Roll Long Beach team. 

This effort supports the goals of Safe Streets Long Beachby improving intersections identified in the City’s High Injury Network and aligns with the latest state safety standards, including California’s AB 413 Daylighting Law. 

This project is part of the Elevate ’28 Infrastructure Investment Plan, a historic initiative dedicated to enhancing Long Beach parks, community facilities, mobility access, and streets. Learn more at lbelevate28.com. 

Timeline

Design and Environmental Review 2024 - 2025
Construction Early 2027 - End of 2027

Project timeline is set barring weather delays and other unforseen circumstances.

Objectives

Project Features

Project Funding

The Downtown Walkable Corners Project, with estimated project cost of just under $24 million, is supported by multiple sources, including grants from the California Active Transportation Program (ATP) and the Metro Active Transport, Transit and First/Last Mile (MAT) Program, with additional support coming from Measure A and Measure M funds.

Contact

For inquiries about the project, please e-mail StreetsCIPProjects@longbeach.gov with the project name in the subject line.