Naples Seawalls Landside Option Findings
Documents
Naples Seawalls Landside Option Findings ... Contruction cost estimate $13.6M $25.3M $36.3M $22 ‐ 27M Noise/Vibration/Cosntruction Impacts Low Medium High Medium‐HighURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples-seawalls-landside-option-findings
-
Naples Seawalls Final ISMND_March2010
Documents
MATERIALS Refer to Mitigation Measure TRA-1 NOISE N-1 Prior to site mobilization, a construction ... and maintained mufflers; Construction noise reduction methods such as shutting off idling equipmentURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples-seawalls-final-ismnd_march2010
-
Item 15a
Documents
required. 5. Construction and Pile Driving Noise Level Restrictions. By acceptance of this coastal ... use of heavy equipment that can cause excessive noise, odors, or vibrations (e.g., pile driving). TheURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/w15a-10-2013
-
Sorrento Trail Outreach Summary
Documents
Sorrento Trail Outreach Summary ... to be safe and free of strangers who might make noise where we live." " This is the only place that isURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/community-survey-summary-10-8-2015
-
BBAC-ComMtg 09172014_FINALR1
Documents
No cross course competition Address outdoor noise Include restaurant Study Myrtha reuse ... Discharge Elimination System (NPDES) Permit Noise – Heavy demolition work hours restricted betweenURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/belmont-aquatics-center/bbac-commtg-09172014_finalr1
-
10-14-2008 Council Letter EIR Certification ORD 08-0029
Documents
10-14-2008 Council Letter EIR Certification ORD 08-0029 ... Impact Report regarding impacts from construction noise, traffic, truck trips, loss of parking, hazardousURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/colorado-lagoon-restoration/10-14-2008-council-letter-eir-certification-ord-08-0029
-
BBAC 10-21-14 Staff Report
Documents
addressing environmental concerns (such as traffic, noise, view corridors, green space, tree protection, etc); ... design NOISE. With this many people attending the competitions, what are the plans for noise abatementURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/belmont-aquatics-center/bbac-10-21-14-staff-report
-
Naples_Seawalls_Guide_Annotated_21414
Documents
Naples_Seawalls_Guide_Annotated_21414 ... very noisy and causes lots of vibrations. The noise and vibrations are not only annoying to humansURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples_seawalls_guide_annotated_21414
-
09-04-2008 Planning Commission Staff Report
Documents
impacts, short-term construction noise impacts, and cumulative noise impacts. A Statement of Overriding ... Land Use None required Noise 73.The City of Long Beach (City) Noise Control Officer shall ensureURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/colorado-lagoon-restoration/09-04-2008-planning-commission-staff-report
-
Naples LSFS Report_Rev3FINAL
Documents
Minimizes vibration during construction Minimizes noise during construction Minimizes existing hardscape ... Minimizes vibration during construction Minimizes noise during construction Can be installed from theURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples-lsfs-report_rev3final