Home Public Works Projects and Programs Street Maintenance

Street Maintenance

Background

The City of Long Beach is responsible for managing nearly 1,000 miles of public streets, which are regularly evaluated through the Pavement Management Plan (PMP). Each street is assigned a Pavement Condition Index (PCI) rating to help prioritize maintenance needs citywide.

The City takes a proactive approach by targeting streets in “Good” to “Fair” condition for preventative surface treatments that extend the lifespan of the pavement and help avoid more costly reconstruction in the future.

This forward-looking strategy is implemented by the City’s in-house Street Maintenance team, allowing for greater control over scheduling, quality assurance, and coordination with other maintenance programs.

This work is part of Elevate ’28, the City’s historic infrastructure initiative to improve parks, community facilities, mobility access, and streets. Learn more and view maps of completed street improvements at lbelevate28.com.

Identifying Streets for Surface Repair

Streets are selected for preventative surface treatments using a combination of the PCI rating along with traffic data and on-site field inspections. This proactive approach extends the life of streets in “Good” to “Fair” condition at a fraction of the cost required for the complete reconstruction of streets that have deteriorated to worse condition.



To see the PCI rating of your street, visit the PMP website.

Please note that while the PCI serves as a valuable tool for assessing road conditions, it is subject to change over time. Public Works crews regularly conduct field inspections to determine whether slurry application is appropriate based on the presence of potholes, state of previous repairs and other factors that may impact the success of street surface treatments.

Preventative Street Maintenance Process

To extend the life of City streets and preserve pavement quality, surface treatments are completed in a sequence involving pothole filling, crack sealing, slurry sealing, and pavement marking.

Streets that are deteriorated past the “Good” to “Fair” rating require an asphalt overlay or full reconstruction. Included as part of the city’s Capital Improvement Program (CIP), these projects are scheduled as funding becomes available.

To learn more about the current CIP, view the Capital Improvement Program Books, and explore projects on the Elevate '28 Mobility and Safety Improvements Page.

Funding

The City works with limited budgets to address as many streets as conditions allow. Street work identified in the City’s PMP is funded through various sources, including City of Long Measure A, Los Angeles County Measure R and other resources as they are available.

For more details see CIP budget.

To meet the growing demand for street repairs and improvements, the City continues to pursue additional funding opportunities, including federal and state grants, potential bond revenues, and internal cost-saving measures to ensure the long-term sustainability of the PMP.

Frequently Asked Questions (FAQs)

More Information